CompanyRemote

AI-Driven Green Subdivision Layout

Deadline: 2026-04-03

Description

Budget: $1500 - $30000

we own the attached that got appoved for 199 lots and the black red and blue is the next phase we want to add to 2 units an acre. plus use open space for equestrian and agrihood and parks to help get approval

I’m preparing a single-family subdivision and want an AI-assisted master plan that tackles the overall layout from the ground up. The central objective is to maximise usable green space while weaving in safe, enjoyable walking and biking paths.

I will supply the site boundary, basic topography, and any zoning setbacks; you use your preferred optimisation tools—whether that’s generative deCivil 3D, Grasshopper scripting, or another AI workflow—to iterate and present the most balanced solution. If your process can also highlight where additional amenities such as small pocket parks or community gardens could fit, that flexibility is welcome, but the walking/biking network and abundance of open space remain non-negotiable priorities.

Please deliver: • A master layout in DWG (and PDF) showing road hierarchy, lot lines, path network, and dedicated green areas • A brief design report explaining the AI methodology, key metrics achieved (percent green area, average lot size, path length), and any assumptions • Native model or script files so future edits or reruns are possible

Accuracy to local standards and clear, build-ready geometry will be my acceptance criteria. I’m ready to start as soon as I see examples of similar optimisation work you’ve done. he entrance on wolfbranch is approved. the 500 acres we are adding we would like 1000 lots 75 by 130 two to the acre. cluster or whatever. We need to win approval. so we are next to the dream horse equestrian and we think we can add to their business and our amenity equestrain trails plus agrihood plus the 170 acre entrence on 44 where the land is low can be used for amenity of lake front homes and turn an eyesore into positive.

The alt keys on lake county property appraisor we have is 1039762 3788799 1039738 3788800 3455096 3957597 and the other is 1048150 1069319 3884112 1114632 1039681 1048192 our approved in the first 199 lots.7 to the acres ( starts the approval ) connects to the land that is 340 acres and diagonal at one edge is 170 acres. so two entrence highway 44 and one entrence wolfbranch. Chat has ideas but you have reality. call me at anytime bob or email meXXX-XXX-XXXX

chats pictures has nothing to do with what we have.

EXHIBIT A

  • MASTER PLAN (GIS OVERLAY STRUCTURE) OVERLAY LOGIC (ON YOUR RED-OUTLINE MAP) WEST (already done) 340 Lots Lake + Entry Feature Primary Amenity CENTRAL CONNECTION ZONE (CRITICAL) Where west ties into east

Include:

Secondary Amenity Center Boulevard Spine Road (tree-lined) Trail convergence node EAST SIDE

  • 680 LOT STRUCTURE POD BREAKDOWN (THIS IS HOW YOU LABEL IT) Pod Lots Acres (Est) Description Pod A (NE) 140 ~70 ac Upper village, quiet, premium lots Pod B (Central North) 130 ~65 ac Green-facing cluster Pod C (Agrihood Edge) 120 ~60 ac Premium lots around farm Pod D (SE Village) 150 ~75 ac Largest pod, family-focused Pod E (South Edge) 140 ~70 ac Buffer-facing estate feel Total: ~680 Lots / ~340–350 acres gross

CORE STRUCTURE (DRAW THIS ON MAP)

  1. CENTRAL GREEN SPINE 60–120 ft wide corridor Connects: Lake Agrihood Amenity Trails

  2. AGRIHOOD (ANCHOR) 40–50 acres Located mid-east (slightly south) Label on map: “Community Agrihood & Open Space Preserve”

  3. SECONDARY AMENITY CENTER Place at connection point

Label: “Community Recreation Center”

Pool Clubhouse Pickleball Lawn 4. TRAIL NETWORK 5+ mile loop Runs: Perimeter buffer Through agrihood Along green spine 5. EDGE BUFFER 50–100 ft natural buffer Label: “Conservation / Natural Edge Buffer” Matches your environmental language perfectly

EXHIBIT B

  • DEVELOPMENT PROGRAM SUMMARY TABLE Category Quantity Total Units ~1,020 West Side 340 East Side 680 Lot Size 75’ x 130’ Density ~2 units/acre Total Acreage ~500+ acres (combined) BUILDER LOGIC (IMPORTANT) 75’ product → strong absorption EXHIBIT C
  • OPEN SPACE & AMENITY PLAN TARGET: 40–50% OPEN SPACE

BREAKDOWN Type Acres Agrihood 40–50 Green Spine 20–30 Parks 15–25 Water / Lakes 20+ Buffers 80–120 Trails Integrated KEY MESSAGE: “Open space is not leftover—it is the organizing framework”

EXHIBIT D

  • PLANNING JUSTIFICATION Use this almost word-for-word: NARRATIVE The Heritage Green master plan utilizes a clustered development strategy to preserve significant open space while achieving appropriate residential density.

Homes are arranged in curvilinear village clusters rather than conventional grid layouts, allowing for:

Preservation of natural features Integration of stormwater within open space Reduced visual impact on surrounding properties A central green spine and agrihood form the structural backbone of the community, promoting walkability, recreation,

Skills

Civil EngineeringGenerative DesignBuilding ArchitectureBackboneAutoCADAIBuilding Design3D RenderingArchitectural VisualizationBuilding Information ModelingUrban Planning3D ModellingSAFe

Want AI to find more roles like this?

Upload your CV once. Get matched to relevant assignments automatically.

Try personalized matching